Bar Mill Upgrade
Owner: Timken, Latrobe Bar Mill
Latrobe, PA (2003 - 2004)

Project Description: Bar Upgrade and Modification Continental Design and management was awarded an EPC Contract to design, procure components and complete construction for Timken Corporation's Latrobe Steel Bar Mill Upgrade. The upgrade represents improvements in the process product quality, as Timken will change from a gas fired furnace to a new state of the art induction heating furnace. The change will allow the Owner to process the product under a nitrogen blanket that will protect the product during the finishing process.

A side benefit of the project is that be changing to an induction heated furnace and eliminating the gas fired furnace, the NOx emissions are significantly reduced from the operation.

Stevens Painton's Construction Group is supporting Continental on the construction of the mill.

Back To Top


Electric Arc Furnace
Owner: Allegheny Ludlum, Electric Arc Furnace
Brackinridge, PA (2003)

Project Description: New Electric Arc Furnace
Continental Design and Management Group was selected to provide detail design services to Allegheny Ludlum for their new Melt Shop expansion, that includes two (2) electric arc furnaces. The construction project requires extensive operations coordination, as existing equipment is taken out of service as the new equipment is place into operation.
Continental was also selected to act as the Construction Manager and coordinate all site construction activity by Allegheny Ludlum.

Back To Top

Quench and Temper Line
Owner: USS Steel Corporation, Lorain Tubular Division
Lorain, OH (2002, 2003)

Project Description: Quench and Temper Mill addition.
Project Manager: Stevens Painton Corporation

Stevens Painton provided site demolition, infrastructure modifications and construction services for installation of new $ 35 million Quench & Temper Mill. Scope of Work included demolition, building modifications, civil concrete work, structural steel, equipment setting and process piping.

Back To Top

Press Line Addition
Owner: General Motors, Parma Stamping Plant
Parma, OH

Project Description: New Stamping Press Installation
Stevens Painton provided site work, excavation structural support modifications and foundation installation for new Stamping Press for General Motors Parma, OH Plant. Work was completed in operating environment working around operations, requiring protection of adjacent operations and inventory.
Project Manager: Washington Group

Back To Top



Bethlehem Steel
Owner: Bethlehem Steel
Sparrows Point, MD (1999-2000)

Project Description: Continuous Cold Mill Project.
Project Manager: Fluor Daniel
Bethlehem Steel's Cold Mill Complex in Sparrows Point, Maryland iincludes a five stand constinuous cold mill capabale of processing 1,700,000 tpy of high quality cold rolled steel with improved tolerances and superior quality. With the pickle line and cold mill linked, Bethlehem will be capable of converting hot rolled coils into finished cold rolled steel for shipment or downstream processing in minutes.

Stevens Painton's work included the extensive pile driving that was required, site excavations, foundation installations(including equipement and building foundations), mill floor slabs and equipment setting of the 5 stand continuous cold mill, the pickle line and and other finishing process equipment.

Back To Top

Selective Catalytic Reduction Project (2002)
Wheatland, IN

Owner: NiSource; Shaeffer Station
Project Manager: Black & Veatch
Description: Install SCR foundations and perform civil work for project.
Back To Top


Combined Cycle Power Plant
Natural Gas Power Generation (2001-2002)
Springdale, PA

Owner: Allegheny Power
Project Manager: Black & Veatch Construction, Inc.
Description: 540 MW combined cycle generating plant; site work; foundations; underground electrical and piping; structural steel erection including Turbine Building and site buildings
Back To Top


Combined Cycle Gas Turbine Power Plant (2001-2002)
Covert, MI

Owner: PG&E National Group
Project Manager: Stone & Webster
Description: Perform civil and foundation work for 880 MW combined cycle plant.
Back To Top


Simple Cycle Peaking Plant (2001)
Natural Gas Power Generation
Crete, IL

Owner: Entergy/DTE Joint Venture
Project Manager: Stone & Webster
Description: 320 MW simple cycle gas turbine power plant; site work and civil; roads, equipment foundations; building foundations; switchyard.
Back To Top


Simple Cycle Peaking Plant
Natural Gas Generation (2000-2001)
Dixon, IL

Owner: Duke Energy
Project Manager: Duke/Fluor Daniel
Description: 640 MW gas turbine power generating plant; civil and foundations; site infrastructure work; buildings.
Back To Top


Selective Catalytic Reduction (SCR) Unit (2000)
Shinnston, WV

Owner: Allegheny Power, Harrison Plant
Project Manager: Parsons
Description: Performed civil and foundation work for SCR project.
Back To Top


Pulverized Coal Injection Facility (1999)
Baltimore, MD

Owner: DTE Ann Arbor, MI
Project Manager: Raytheon E&C
Description: Mechanical equipment setting for pulverized coal injection facility at Bethlehem Steel, Sparrows Point, MD

Back To Top



Corporate Headquarters:    7850 Freeway Circle    Suite 100    Middleburg Heights, OH 44130    voice: 440.234.7888    fax: 440.234.1967